Construction conditions
Clean rooms are not allowed to use wood materials and other materials that do not meet the requirements of cleanliness standards. All kinds of materials should be stored in a clean and dry environment with enclosure.
The thickness, specification, size specification and quality of the sandwich panel must conform to the design requirements and the contract requirements, and must got the inspection report.
The floor in the clean room must flat and clean to avoid the finished floor uneven.
Before finalize the AUTO CAD design, engineers and designers should visit site to make sure the design match the job location.
Accessories such as small hardware standard parts, must meet the design requirements, and should be got certificate accordingly.
There are sufficient temporary storage sites for materials and aluminum alloy processing and semi-finished products.
Construction scheme for a modular standard clean room project
/