●The guide rail of electric tools or equipment used for material opening must be protected by soft material, the cutting edge of the tool must be complete and sharp, and a proper amount of lubricating oil should be added to the edge before opening.
●Check the surface if there is any defect from the surface for each sandwich panel, if there is any defect, then put it on beside and protect it in order to use on any other part.
●Wall panel and ceiling panel should installed flat, tight and uniform. The gap between them should control less than 3mm width to ensure the quality of subsequent gluing.
●The point between the partition panel and ceiling panel is flat and tight, remains relatively flat after load.
●The longitudinal connection between ceiling panel and another ceiling panel adopts the form of buried steel beam. If the length of the ceiling plate exceeds 2500㎜, the suspension beam should be strengthened.
●The position of all tuyere and lamps in a turnkey clean room facility should be taken into account when the ceiling is arranged, so as to avoid the seam of the plate basically, so that the ceiling sandwich panel can ensure the strength.